• Skip to content
  • Skip to main navigation
RICS logo RICS iSurv logo isurv international
Channels Show the navigation
  • Building surveying
  • Commercial Property
  • Construction
  • Infrastructure
  • Planning
  • Rural
You are here:
  1. Home
  2. Channels
  3. Construction
  4. Contract administration
  5. Rectification period
  6. What is the rectification period?

What is the rectification period?

Rectification period timeline

On practical completion the architect/contract administrator should:

  • Previous Page What is the rectification period?

  • What is the rectification period?

    -

    • What is the rectification period?
    • Rectification period timeline
  • Defects at practical completion
  • Liability periods

    +

    • Liability periods
    • Outstanding work and completion
    • Limitation of liability
  • Further information on the rectification period
  • Resources

    Resources

    Close tab
  • RICS standards and guidance

    RICS standards and guidance

    • RICS standards and guidance
    Close tab
RICS logo RICS iSurv logo isurv
  • © 2025 isurv

  • About
  • Contact
  • Help
  • Accessibility
  • Terms and Conditions
  • Privacy Policy

Suppliers

  • Designed and Powered by Jadu.
  • Twitter
  • LinkedIn